Switching to solar is fertile ground for energy savings.
69,920 Kilowatt Solar Power Systems
FERTILIZER MANUFACTURER IN VISALIA, CALIFORNIA
THE CHALLENGE
Biagro Western Sales needed to make its fertilizer manufacturing operation more energy-efficient, while keeping its workplace cool and comfortable in the hot summers of California’s Central Valley. A solar energy system seemed to be the best solution and the plant went the extra mile and installed a distilled water system.
THE PROCESS
Barrier designed a system using 304 Yingli rooftop solar panels, painstakingly installed so as not to interfere with the day to day operations of the highly volatile fertilizer manufacturing plant.
THE RESULT
The impact of Barrier’s solar system was immediate and impressive, dramatically reducing the plant’s monthly electric bill while providing ample power for its manufacturing operation and keeping workers cool during the hot summer months. Additionally, the facility’s reduced carbon footprint demonstrates the company’s commitment to environmental responsibility.
Project Type: | Industrial |
Client Name: | Biagro Western Sales |
Mount: | Roof–IronRidge |
Panels: | 304 |
Inverter(s): | 1 (PV Powered 75 kW) |
Annual Kilowatt Hours: | 108,393 |
“Getting a handle on our energy costs has greatly increased our cashflow.”
“The impact of Barrier’s solar system was immediate and impressive, dramatically reducing the plant’s monthly electric bill while providing ample power for its manufacturing operation and keeping workers cool during the hot summer months. Additionally, the facility’s reduced carbon footprint demonstrates the company’s commitment to environmental responsibility.”
Project Details
Categories:
CALL FOR YOUR FREE EVALUATION & ESTIMATE: 1-877-233-2003
RECENT PROJECTS
TESTIMONIALS
“In my business, time is money. I know the job is going to be done with Barrier, and I can move on to the next project.”
Having completed over 65 successful projects with Barrier Roofing as a part of the Span Construction team, I can without question recommend them for your next project.
Barrier nitro coating was applied to the walls, floor and ceiling in our new dairy milking barn. We are completely satisfied – not only is it very durable, but it also cleans up very well without much effort.”
Barrier put a polyurethane foam roof over 200,000 square feet at our facility, which has saved us over 30% on our energy bill – and without any leaks!